Charter Steel鈥檚 cut-to-length bar mill utilizes precision sizing to produce carbon and alloy steel bars for a variety of industries. Construction of the new mill, was built side-by-side with the existing coil-producing line, beginning in the spring of 2017. 聽Operations at the Cuyahoga Heights plant continued running uninterrupted during construction on a 24/7/365 shift schedule.

The project was completed in 2019 and represents the largest investment in the family-owned company’s 81-year history.聽 The new cut-to-length product adds capacity enabling Charter Steel to not only serve existing but expand to new customers who make fasteners and wire for automotive and parts manufacturers. RLG crews worked 50-60 hours per week to meet the fast-track schedule.

Construction work was entrusted to a long-term Charter Steel partner 鈥 the 精东影业影视’s northeast Ohio operations 鈥 which has been working with Charter since 2009.聽 RLG completed past projects such as the waste water treatment and bag house expansion.

This project included:

  • Supply and erection of 170,000-square-feet of Varco-Pruden pre-engineered metal聽buildings
  • Significant structural reinforcement of adjacent existing pre-engineered聽buildings
  • Installation of all concrete building foundations, equipment foundations, slab聽on grade, embedded steel, reinforcing, and anchor bolts totaling over 25,000 cubic yards
  • Material handling and equipment setting and erection
  • Fabrication of header piping for internal drainage completed at RLG’s 聽in-house shop
  • Complex equipment foundations and elevated cantilevered FDNS for two KOCKS mills, three cold shears, coil transfer car tracks, saw roller tables, bar bundler,聽and stacker storage equipment
  • Installation of (1) 35T, (3) 25T, and (1) 7.5T overhead cranes including girders,聽crane rail, hot rails, and walkway platforms

 